More burning off of old paint today, but I also returned the cockpit floor to its place after stripping and repainting it, which feels like some sort of progress!
Paul Drake was there today, raking out the old caulking, It's quite obvious why Robinetta was leaking this last year as a lot of it was wet.
Monday, 9 January 2012
Friday, 6 January 2012
Getting started
First visit to Robinetta of the year, and time to really get down to work. My job is to strip off all the old paint and anti-fouling, which will let us examine the hull, and find the problems that need fixing. It's a long job, and I did less than 1/16 of the hull today.
Meanwhile Julian began to rake out the old caulking. Paul Drake (our shipwright) will do most of it, but he also need to do the re-caulking, stopping and any other re-fixing of nails etc, so the more we can do ourselves the better!
Meanwhile Julian began to rake out the old caulking. Paul Drake (our shipwright) will do most of it, but he also need to do the re-caulking, stopping and any other re-fixing of nails etc, so the more we can do ourselves the better!
Sunday, 11 December 2011
Spar diameters
Here is an equation from Skene, rendered by Codecogs. Pretty nice.
![\frac{L}{\sqrt[3]{\frac{I}{\Upsilon}}}](https://lh3.googleusercontent.com/blogger_img_proxy/AEn0k_timlQxi3yrI0bPJlNYTdXOLMQc7uGd5VDudfEqXmZPESPQWaooQqm28rMlSTlDWFDiHoRH3axeSFgvLzvigMNw5e0AhYnRa-t7TjC7WnOg-SsuIELQvxxXX2b_Qb16edbSyczbhF76HMsHEpsacdSBJoga34lT_1mi-FPrx8LdFIHO8Ih9qYbTTMc7gTY=s0-d)
I found a Beam Deflection Calculator that uses the same formula for a solid beam. If I put my 14' gaff into it with Skene's rule of thumb of 0.02 L as the diameter I can compare the deflection of a solid gaff with that of various different hollow gaffs.
So Skene says my gaff should be 3.36" max diameter if its solid. This gives a deflection of approx 1.5" for a 10 lb force.
I get about the same deflection for a 3.64" diameter gaff made with 1/2" walls or a 3.38" diameter gaff with 1" walls. So a 10% extra diameter and thin walls sounds like a real plan.
This calculation is perfect for relative strengths but it doesn't help much with deciding if scots pine is OK or do I need douglas fir.
I found a Young's modulus of 13 x10^9 N/m^2 on one site.
TRADA provides the following:
Douglas fir
European Redwood
I found a Beam Deflection Calculator that uses the same formula for a solid beam. If I put my 14' gaff into it with Skene's rule of thumb of 0.02 L as the diameter I can compare the deflection of a solid gaff with that of various different hollow gaffs.
So Skene says my gaff should be 3.36" max diameter if its solid. This gives a deflection of approx 1.5" for a 10 lb force.
I get about the same deflection for a 3.64" diameter gaff made with 1/2" walls or a 3.38" diameter gaff with 1" walls. So a 10% extra diameter and thin walls sounds like a real plan.
This calculation is perfect for relative strengths but it doesn't help much with deciding if scots pine is OK or do I need douglas fir.
I found a Young's modulus of 13 x10^9 N/m^2 on one site.
TRADA provides the following:
Douglas fir
Strength Properties (N/mm2) | Strength Class | ||
| C14 | C18 | ||
| Bending Strength | f m,k | 14 | 18 |
| Tension Strength | f t,0,kf t,90,k | 8 0.4 | 11 0.5 |
| Compression Strength | f c,0,kf c,90,k | 16 2.0 | 18 2.2 |
| Shear Strength | f v,k | 1.7 | 2.0 |
| Modulus of Elasticity | E 0,meanE 0,05E 90,mean | 7 4.7 0.23 | 9 6.0 0.30 |
| Shear Modulus | G g,mean | 0.44 | 0.56 |
| Density | r kr mean | 290 350 | 320 380 |
European Redwood
Strength Properties (N/mm2) | Strength Class | ||
| C16 | C24 | ||
| Bending Strength | f m,k | 16 | 24 |
| Tension Strength | f t,0,kf t,90,k | 10 0.5 | 14 0.5 |
| Compression Strength | f c,0,kf c,90,k | 17 2.2 | 24 2.5 |
| Shear Strength | f v,k | 1.8 | 2.5 |
| Modulus of Elasticity | E 0,meanE 0,05E 90,mean | 8 5.4 0.27 | 11 7.4 0.37 |
| Shear Modulus | G g,mean | 0.50 | 0.69 |
| Density | rkr mean | 310 370 | 350 420 |
Musings
I should be in the garage re-assembling Worm's outboard motor.
I should be in the garage making better rowlocks for Worm.
I should be in the garage.
Funny how centering some text makes one feel like a poet.
I am (sort of) working out the scantlings for Robinetta's new gaff. I started by googling. A forum post led me to Skene's Elements of Yacht Design. Google books has a searchable version and I'm working through the hits on gaff in the book. There are lots of sums and I really want to understand how they apply. On the other hand, the most relevant text is 'The loading of booms is almost impossible to determine and reliance may be placed on the proportions indicated in the diagram.' The diagram says a solid gaff should have a max diameter D = 0.02 times its length. The peak end diameter should be .75 D. The throat diameter should be .93 D. Skene goes on to say 'If the boom or gaff is to be made hollow, a section may be used having the same ratio as that of a circle of diameter indicated for the solid spar.' And there is an equation. I'm going to see if I can get the equation into this blog. Earlier in the book there is some maths about hollow spars. I'll get to that but I'm currently distracted by another hit I got when searching for Skene's book.
One link took me to a review of Skene by Tom MacNaughton. I've not come across him before but he's a Naval Architect in Maine. His website is wonderful and I got completely waylaid by the text on his Yacht Design School. In the FAQ there is a question 'What kind of designs are most often requested?' The answer is this lovely list:
- Ones too large for the customer to afford.
- Once with too many features to pack into the requested size.
- Overly complicated ones.
- Ones with features incompatible with the chosen service. (Mostly commonly overly shoal boats for offshore use.)
- Ones that sacrifice good performance to chase fashions that are confused with technological advances.
- Ones that sacrifice appearance and investment value to ill conceived fashion.
- Ones for production boat builders who refuse to commit to even minimally safe scantlings.
Cool huh?
Sunday, 4 December 2011
Could be worse
The mast is out, so it was time to look at the problems. We undressed the mast and brought all the rigging home. Its a pain to have to remove the VHF and anchor light wiring to get the rigging off, but has to be done.
The mast had suffered quite a lot from shackles pressing in to it, but nothing serious. We must try to avoid that when we dress it in the spring.
The serving I did a couple of years ago on the flexible wire is holding out well. The only serious chafe was on the peak halyard that had pushed its way down the mast. I hadn't got the screws deep enough into the mast on the new fittings last time, but it is not a serious problem.
Brass screws don't seem to suffer zinc leaching this far above the waves which is good to know.
The mast collar was totally rotten and definitely the cause of the mast moving forwards. It all came off easily, with just one broken screw left in the deck. The deck seems solid with no sign of any movement, so that is a big relief. Making a new collar seems very straight forward and would be a good use of whitebeam I think; it is rock hard and wearing very well on Worm where it is varnolled. Or I could use some iroko we have.
Started looking at servicing the engine. Needs a lot of cleaning and we need to bring a battery back to run the engine to warm the oil up.
Alison found lots of grease squeezed out from around the stern gland. Something is wrong there. Must take it apart and repack it.
The mast had suffered quite a lot from shackles pressing in to it, but nothing serious. We must try to avoid that when we dress it in the spring.
The serving I did a couple of years ago on the flexible wire is holding out well. The only serious chafe was on the peak halyard that had pushed its way down the mast. I hadn't got the screws deep enough into the mast on the new fittings last time, but it is not a serious problem.
Brass screws don't seem to suffer zinc leaching this far above the waves which is good to know.
The mast collar was totally rotten and definitely the cause of the mast moving forwards. It all came off easily, with just one broken screw left in the deck. The deck seems solid with no sign of any movement, so that is a big relief. Making a new collar seems very straight forward and would be a good use of whitebeam I think; it is rock hard and wearing very well on Worm where it is varnolled. Or I could use some iroko we have.
Started looking at servicing the engine. Needs a lot of cleaning and we need to bring a battery back to run the engine to warm the oil up.
Alison found lots of grease squeezed out from around the stern gland. Something is wrong there. Must take it apart and repack it.
Thursday, 1 December 2011
Year End Totals
Thought it was time to write up our personal logs, which means totaling up Robinetta's log. This year she has traveled 610 nm in 35 days; that's 17 nm per day on board...
The engine was run for 84.5 hours. With the new propeller it takes 1 ltr of fuel/hour on average, which is useful to know, but I MUST get around to measuring the capacity of our fuel tanks!
The engine was run for 84.5 hours. With the new propeller it takes 1 ltr of fuel/hour on average, which is useful to know, but I MUST get around to measuring the capacity of our fuel tanks!
Sunday, 13 November 2011
Last Outing
Robinetta is due out of the water on Monday, and with the main sail out of commission there was no chance to sail this weekend. We did want to top up the fuel tanks for the winter though, so motored over to Tollesbury. It was sunny on the way there, although chilly with the east wind, and there was more swell than we expected out by the Mersea Quarters buoy.
By the time we were heading back the wind had risen, and the sun disappeared behind thick cloud making it really feel like a bleak November day. I helmed in both directions, while Julian loosened up and greased the shroud shackles so they would be easy for the yard tomorrow, then I ran the water pump while the engine was running to drain the fresh water system down.
Once back on the mooring Julian got the boom off the mast, then we tied up all the halyards to the mast. Laying up has begun!
By the time we were heading back the wind had risen, and the sun disappeared behind thick cloud making it really feel like a bleak November day. I helmed in both directions, while Julian loosened up and greased the shroud shackles so they would be easy for the yard tomorrow, then I ran the water pump while the engine was running to drain the fresh water system down.
Once back on the mooring Julian got the boom off the mast, then we tied up all the halyards to the mast. Laying up has begun!
Subscribe to: