Saturday, 15 January 2011

OGA AGM

Dashed from the boat show to the Cruising Association HQ in Limehouse for the AGM. Missed the financial report and weren't last!

We tried to go last year but the trains were messed up. I wasn't sure what to expect but it was great. Got to meet several people new to us and get a flavour of the Solent region. There are more commercially minded people in the Solent and this seems to cause some friction with the folks at the opposite end of the spectrum.

The "big thing" was the discussion around the celebrations for the 50th anniversary in 2013. There is a struggle here between the imperatives of funding, the opportunity for publicity and the need to be inclusive of all the existing members.

I think we need a better way of keeping in touch.

At the boat show

Had some nice chats at the boat show and bought some rope. Nice people at the Cruising Association (including Brian & Lorna of course), at the Westerly Owners Association (Alan & Norma Banks), Howard & Sue with good advice on our propeller and some random people here and there.

It turns out that the owners of the first Rayner boat and more or less the last Westerly - Norma Ann - live 12 miles apart and keep their boats about the same distance apart!

Looked over the new Cornish Crabber 26. Apart from the fact that she's a shoal draft boat with a centre board she looks like Robinetta stretched 4' amidships. I think the Commander would have loved her. The down side is that she sells for 10 times the price we paid for Robinetta.

Sunday, 2 January 2011

Propeller Details

Our old propeller is a 3 blade bronze propeller marked 12x10. That's 12" diameter with a 10" pitch. It is right handed with a 12:1 taper of the hole for the shaft from around  25mm down to 20mm over a shaft length of 57mm.

Reading around the web the most efficient propeller would have one blade and the smoothest would have a large number of blades. Yacht propellers are always 2 or 3 bladed. Two needs a larger diameter for the same thrust.

Wednesday, 29 December 2010

End of the year

The weather has been horrible for the last fortnight, snow on the ground, and the temperature hovering around freezing. A week earlier it hit -15C in our garden. It finally crawled up to 5C today, so we headed over to Robinetta, despite quite thick fog.

The repairs look good, and the extra fastenings on the other planks at the bows should stop them from springing even if we get more iron nail sickness. Julian dried the bare wood off with a heat gun, and then got it under-coated, while I did the stern quarter.

We had taken the wedges out from the mast and soaked them in Cuprinol for a fortnight, and on this trip we put them back, painting the inside of the mast hole with Curprinol. We need a better method of sealing the mast boot..

We rigged a tarpaulin over the cabin top and cockpit to try and keep the inside a bit drier, then headed home. The days are really short at this time of year!

Friday, 17 December 2010

Professional repairs done!

Got a phone call from Paul Drake today: He's finished the work we commissioned! Robinetta should now be water tight at the bows, with no rotten planks, and the starboard stern quarter is back in one piece. We need to leave about a week for the putty sealing the caulking and the screw heads to harden, then we'll head over and give the bare wood a coat of paint.

Sunday, 28 November 2010

Running Rigging

Went up today and measured Robinetta's running rigging. Its over 10 years old and showing chafe in a lot of places.

There is some 8 mm buff polyester (must be polyester, it sinks):
  • topsail downhaul
    • from a ring on the top of the throat of the gaff to a cleat on the mast. 20'
  • shroud tensioners
    • four off 8' (actually 7' + manrope knot)
  • Total
    • 52' = 16m
There is some 10 mm  buff polypropelene (it floats! - Hempex or Hardy Hemp):
  • topsail halyard
    • runs through sheave in mast. 730 cm from sheave to bottom of cleat so 14.6 m
  • back stays
    • 16'6" plus loop round blocks and eye splice each say 40' or 12m
  • topping lifts
    • hypotenuse of luff and foot of mainsail + tensioning length plus loops round boom + splicing length
    • hard to measure without taking the sail cover off, but in good condition – not necessary to replace
  • Total
    • 14.6 m + 12 m = 26.6 m
    • We could buy 30m of this or just do the back stays and buy 15 m. The topsail halyard might be better in Dynema so we can use it to go up the mast safely.
There is a lot of buff polypropylene, probably 12mm but could be 14 mm:
  • Jib halyard
    • purchase on deck with knot to block dependent from wire rope and back to cleat on mast. 2x23'=46', say 50'
  • peak halyard
    • eye splice on horse to block on mast 21'. up, down and back to cockpit 52'
  • throat halyard
    • eye splice on horse to block on mast 20'. up, down and back to cockpit 50'
  • main sheet
    • 17 m
  • Total
    • 64 m, buy 70m
There is some 12 mm Braid (not measured):
  • jib sheet
And some 6 mm braid (not measured):
  • roller furling line
  • staysail sheet
  • topsail sheet

Monday, 22 November 2010

Progress

Its been really hard finding the time and motivation to go to the boat this autumn. We have been a couple of times and achieved:
  • drilling out and filling the stem post
  • removing the rotten rear starboard bulwark. Found some rot in the top hull plank too
  • drilling out the old depth transducer
  • putting on a coat of underwater primer
Today, Alison went up there and met with Paul Drake, recommended by Keith and Julie. He's going to use some Siberian larch to repair the popped and rotten planks that have been letting all the water in. Hopefully that will be done by Christmas.